====== Zeche Friedrich-Heinrich: | ====== Zeche Friedrich-Heinrich: | ||
- | (Jan Sonntag, Rolf Becker, 2022-10-19) | + | (Jan Sonntag, Shreya Gupta, Rolf Becker, 2022-10-19) |
Kamp-Lintfort is now covered by the community-driven **open LoRaWAN** network of **[[https:// | Kamp-Lintfort is now covered by the community-driven **open LoRaWAN** network of **[[https:// | ||
Anyone in the area can now deploy their own LoRaWAN devices and use the new gateways for free to transmit data to their own TTN applications. | Anyone in the area can now deploy their own LoRaWAN devices and use the new gateways for free to transmit data to their own TTN applications. | ||
- | Our **first application** is the data collection of our own **[[eolab: | + | Our **first application** is the data collection of our own **[[eolab: |
===== It's all coming together ===== | ===== It's all coming together ===== | ||
Line 17: | Line 17: | ||
| Fig.: The two white rod antennas at the southwest corner of the tower of the Friedrich-Heinrich colliery. | | Fig.: The two white rod antennas at the southwest corner of the tower of the Friedrich-Heinrich colliery. | ||
- | Because of the metal cage encompassing the upper platform of the tower, the antennas had to be placed at a distance, otherwise, their range might be impacted. With the help of the former miner **Jörg Kamps** from the HSRW FabLab Team, we together designed a simple holder and he could manufacture multiple ones made from stainless steel. These enabled us to specifically tune the distance from the metal cage for each individual antenna. Therefore we used our Network Analyzer which enables us to see the frequency at which the antennas are able to receive data. | + | Because of the metal cage encompassing the upper platform of the tower, the antennas had to be placed at a distance, otherwise, their range might be impacted. With the help of the former miner **Jörg Kamps** from the HSRW FabLab Team, we together designed a simple holder and he could manufacture multiple ones made from stainless steel. These enabled us to specifically tune the distance from the metal cage for each individual antenna. Therefore we used our Network Analyzer which enables us to see the frequency at which the antennas are able to receive data. Thanks to **RF Frontend GmbH** to support us with antenna tuning! |
- | | {{: | + | | {{: |
- | | Fig.: Using a vector network analyzer \\ to tune the antenne | + | | Fig.: Using a vector network analyzer \\ to tune the antenna |
In the end, we were able to tune them just right. The first insight into the coverage we are able to achieve is shown by [[https:// | In the end, we were able to tune them just right. The first insight into the coverage we are able to achieve is shown by [[https:// | ||
Line 30: | Line 30: | ||
As of writing this there where no test done yet on the southern gateway. | As of writing this there where no test done yet on the southern gateway. | ||
+ | |||
+ | ===Network Activity=== | ||
+ | |||
+ | | {{ : | ||
+ | | Fig.: Activity of north-east gateway (2022-10-19T16: | ||
The system is all powered through mains power provided by the tower itself. On the northern side, an electrical box is located where all the network and power distribution over PoE (Power over Ethernet) is done. The idea is to later add a redundant internet connection as well. | The system is all powered through mains power provided by the tower itself. On the northern side, an electrical box is located where all the network and power distribution over PoE (Power over Ethernet) is done. The idea is to later add a redundant internet connection as well. | ||
Line 35: | Line 40: | ||
More tests with the system will be done in the near future. | More tests with the system will be done in the near future. | ||
- | We would like to thank the **Municipality Kamp-Lintfort** as well as **Elektrosteiger Jörg Hunsmann** | + | We would like to thank the **Municipality Kamp-Lintfort** as well as the former |