soil_sampler:tests
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| soil_sampler:tests [2021/04/20 09:45] – [Drilling] jeff001 | soil_sampler:tests [2023/01/05 14:38] (current) – external edit 127.0.0.1 | ||
|---|---|---|---|
| Line 3: | Line 3: | ||
| ===== Drilling ===== | ===== Drilling ===== | ||
| - | ====Test1==== | ||
| Place: GreenFabLab, | Place: GreenFabLab, | ||
| Date: 16/ | Date: 16/ | ||
| + | |||
| + | This test was made to check the behavior of a drill to get familiar with the process and consider it for machine structure requirements. | ||
| + | Soil type: Clayey | ||
| **Materials: | **Materials: | ||
| Line 14: | Line 16: | ||
| - Torque: 21/55Nm | - Torque: 21/55Nm | ||
| - | 2. Bit:\\ | + | 2. Drill bit:\\ |
| - | - Diameter: 32mm | + | - Diameter: 32mm\\ |
| + | - Length: 500mm | ||
| - | {{: | + | {{: |
| **Process: | **Process: | ||
| - | Drill down the soil | + | The first time, I got to drill 30cm depth.\\ |
| + | {{: | ||
| + | |||
| + | The second time, I got to drill 50cm, which is the total length of the bit.\\ | ||
| + | {{: | ||
| + | |||
| + | **Outlook: | ||
| - | **Results: | + | During this test, it was remarkable that [with this amount of torque and these soil conditions] it is not possible to take a soil sample by drilling more than 30 centimeters deep in one go, separate the total depth on multiple phases would be a good an alternative to increasing torque in this case. |
| - | - During tests | + | <!--Measuring the torque in every moment, then when the torque demanded increases, finish that phase, clean the bit and continue with the next one.--> |